Key Industries
Chemical
Projects
Chemical
CMS supplied fabrication and installation, along with project supervision of all mechanical, electrical & civil work…
CMS were awarded the Mechanical Package for the installation of Tanks and piping and tie ins into existing plant......
The Hypo Plant needed upgrading for capacity which entailed modifying the existing Titanium Reactor....
The client was impressed by methodologies to reduce risk and cost, whilst still keeping the plant in production…
2 x 70,000 litre 304 stainless steel resin tanks..........
A new HFA Storage area for Ballance Agri-nutrients was installed by CMS consisting of 3 x 70,000 litre tanks; pumps; filters; valves; safety showers........
CMS was subcontracted to fabricate & install 80,000 litre 98% Sulphuric Acid Bulk Storage Tank for Te Mihi Power Station........
CMS supplied fabrication and installation, along with project supervision of all mechanical, electrical & civil work…
CMS converted a redundant plant to a food grade storage warehouse, including all new tanks and lines…
The CMS team fabricated an incolloy 825 alum sulphate reactor, using our proprietary welding procedures...
The CMS team assisted Orica Chemnet with the design and manufacture of two PAC Plant reactors…
Since 2006, CMS have been engaged by Orica Chemnet for numerous tank and plant installation projects…
Ballance Agri-Nutrients engaged the services of CMS during a Turn Around Shut. Services included fabrication and installation of lines…
CMS was engaged by Orica Chemnet Fiji to replace storage tanks and upgrade lines at a Sodium Hypo Chloride Plant…