Ballance Kapuni

Ballance Kapuni Turn Around Shut

  • Company:Ballance Agri-Nutrients
  • Location: Kapuni, Taranaki
  • Date:February – March 2012
+ Overview

This project including the following tasks:

  • Replace Nb500, Nb350 carbon steel CO2 transfer line with 316L stainless steel
  • Install flange sets and fabricate and install inline filters in to 2 Nb100 sch160 carbon steel ammonia feed pump lines, pre and post heat treated
  • Fabricate and install raw water flow meter manifold
  • Replace a section of the ammonia kickback drain line with Nb50 and Nb150 sch160 316L
  • Fabricate and install a new Nb25 sch160 316L sample line on reactor 2
  • Replace other sections of 316L process lines
  • Remove coils from the boilers air heater

CMS Project Supervisor
Tony Jump

Project Manager
Peter Jenkins – Ballance Agri-Nutrients

Listing Lead In Text:

Ballance Agri-Nutrients engaged the services of CMS during a Turn Around Shut. Services included fabrication and installation of lines…

Ballance Kapuni Turn Around Shut